Flat-roof repair
Local membrane damage, drains, curbs and insulation conditions.
Explore the details
Plan commercial roof repair, restoration and replacement around the assembly, drainage and the space operating below it.
A membrane split, an open seam and an overflowing drain can all put water inside, but they call for different work. Assessment follows the water route at drains and scuppers, checks seams and perimeter attachment, and inspects flashings around equipment curbs and pipe penetrations. Trapped moisture or damaged insulation can extend the affected area below an apparently small surface opening.

The condition below the visible membrane can change which options remain useful.
TPO welding, EPDM seam repair and coating preparation have different material requirements.
Plan the roofing work with the operating property, without assigning a schedule before its conditions are known.
Tenant access, sensitive interiors and the areas beneath removal need protection planned with the work. Phasing depends on the building and the actual scope.
Roof access, material loading and removal routes need space and a workable sequence. Loading docks and customer entrances belong in that discussion.
HVAC disconnection or lifting needs the appropriate trade coordinated with the roof work. Curbs and penetration flashings need to suit the renewed assembly.
The existing membrane and the condition beneath it decide which work is practical.
Local membrane damage, drains, curbs and insulation conditions.
Explore the detailsRemoval, insulation, attachment and occupied-building coordination.
Explore the detailsHeat-welded seams and compatible thermoplastic details.
Explore the detailsRubber membrane seams, flashings and terminations.
Explore the detailsDry substrate, adhesion, repair and preparation before restoration.
Explore the detailsNo. A coating is a surface treatment. Wet layers and their cause need to be addressed in the restoration or replacement scope.
Yes. Access, loading, entrances, equipment and sensitive interior areas belong in the planning conversation. The actual sequence depends on the building, weather and work.
Tell us the building address and what is happening below the roof. Request a free inspection to discuss the system, access and practical work scope.